We are absolutely convinced that if either of the following two statements are true about your business, then you are doing R&D works and should speak with us.

3D Modelling

We have worked on developing 3D models for projects that we have been working on. Our models have been used for manufacturing and/or installation purposes and are bespoke to each project.

Non-standard Design

The architects had an ambitious project. They wanted to create a unique look that required some unconventional structural design to achieve this. Through collaboration we developed a scheme that would meet the brief.

2

Years of previous projects can be included and backdated for R&D purposes.

Engineers in the UK

%

Construction Sector Claims

Average Claim

Typical R&D Sentences

Sustainable Design

Environmental, Design

We worked on a design scheme where specific sustainable goals were set out in the initial brief. The combination of material specification, geographical components and installation methods had to be bespoke to attain the goals set out in the initial brief. This led to innovative methods and required intense testing to ensure materials met the demands required.

Integrating Toxic / Other Waste Disposal Systems into a Building

Environmental, Design

Our design incorporated waste disposal systems that integrated with existing infrastructure or local services to ensure greater environmental performance.

Innovative Design

Environmental, Design, Manufacturing

We took the initiative in designing a new, or improving on an existing, system that improved the original scheme. 